Siding estimating software
Bid more siding and cladding. Price each panel type.
Siding and panels by area from the elevations, with the openings cut out. Trim, fascia and flashing by the foot. Furring at its spacing.
Kredna keeps each quantity on the elevation it came from and prices it with your own costs.
Illustration on a made-up plan.
What a siding takeoff carries.
Cladding is drawn as areas on the elevations, with cutouts at the windows and doors. Trim and flashing are drawn as runs.
| What you take off | How | Carried in |
|---|---|---|
| Lap siding Drawn on the elevations with the openings cut out, carried in squares. | Area | SQ |
| Metal and composite wall panels | Area | SF |
| Stucco | Area | SY |
| Exterior insulation and finish system | Area | SF |
| Corner trim and fascia Corners by their height on the elevations. | Linear | LF |
| Trim at openings | Linear | LF |
| Soffit From the soffit and reflected ceiling plans for exterior ceilings. | Area | SF |
| Flashing at openings and bases | Linear | LF |
| Weather barrier | Area | SF |
| Furring behind panels A part works out rows of furring at the spacing you set, across the wall area. | Area | LF |
Measure the walls on the elevations.
Draw each siding or panel area on the building elevations and cut out the windows and doors. Make each cladding type its own item, read from the exterior finish legend.
Use the floor plans for the building perimeter, and check that each wall face is on an elevation you measured.
Carry each material in the unit you buy it in.
Carry lap siding in squares, stucco in square yards, metal and composite panels in square feet. Switch the displayed units to metric and you see square meters.
Price what goes behind the cladding.
Take off the weather barrier by wall area. Give your furring item a spacing property and a formula on the wall area, so a change from 16 to 24 inches on center changes the feet you buy.
The wall sections show the girts, clips and furring each system needs. Add them to your item as parts.

Build your siding items once.
There is no siding starter pack. Build your items in a Siding and cladding folder in your library, for example in three parts: siding and panels, trim, and behind the cladding. Items like these:
- Lap siding in squares, metal wall panels and composite wall panels
- Stucco in square yards, and exterior insulation and finish system
- Corner trim, trim at openings, soffit, fascia, and flashing at openings and bases
- Weather barrier, and furring behind panels at a set spacing
- Your own clauses for the cladding and weather barrier, access from the ground or a lift, and framing, windows and sealants by others
The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

Settle what is by others before the bid goes out.
Set up the scope assistant for siding and cladding once: what to look for, which disciplines and spec sections to read, and what is usually by others. It reads the elevations, the exterior finish legend, wall sections and details for cladding scope, highlights each reference so you can jump to it, and flags lines like these as usually another trade's. Its findings stay drafts until you accept them.
- Masonry veneer
- Windows, storefront and curtain wall
- Wall sheathing and framing
- Joint sealants, unless listed
- Roofing sheet metal
AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.
Moving from another takeoff tool?
Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.
Siding and cladding questions
How do I take off siding from the elevations?
Can siding be carried in squares?
Can Kredna work out furring from the spacing?
Who carries the flashing at windows?
Is access equipment in the price?
Bring a siding set you know.
See elevations, trim and the proposal come together on a job your company has bid.