Electrical estimating software
Bid more electrical work. Count it once.
Fixtures on the lighting plans, devices on the power plans, gear on the one-line.
Kredna counts devices and fixtures, measures conduit and cable on the PDF, and prices the material and labor with your own costs. The electrical starter pack is included, so the assemblies are there from the first job.
Illustration on a made-up plan.
What an electrical takeoff carries.
Count the devices and fixtures, draw the runs, count the gear. Each device and fixture is an assembly, so its box, plate, wire and labor come with every count.
| What you take off | How | Carried in |
|---|---|---|
| Receptacles and switches Duplex, GFCI and dedicated receptacles; single-pole and 3-way switches; wall switch occupancy sensors. | Count | EA |
| Device parts Box, mud ring, device, plate, connectors and a wire allowance for each device, with Rough-in and Trim labor. | Count | EA, LF |
| Light fixtures by type One item for each type mark on the fixture schedule: fixture, whip, box and, in grid ceilings, supports. | Count | EA |
| EMT conduit 1/2" to 2": sticks, a coupling at each stick, a connector at each end and straps at your spacing. | Linear | LF |
| MC cable 12/2, 12/3, 10/2 and 10/3: cable with makeup in whole coils, connectors and supports. | Linear | LF |
| Wire in conduit #12, #10 and #8 THHN: the run and its makeup times the conductors. | Linear | LF |
| Floor boxes and data rough-in Data rough-in is the box, ring, conduit stub and pull string. The cabling is by others. | Count | EA |
| Panelboards, transformers and disconnects From the panel schedules and the one-line diagram. Set the breakers to the panel schedule. | Count | EA |
| Equipment connections A flexible whip, fittings and terminations to equipment furnished by others. | Count | EA |
| Temporary power, lifts, fire alarm and closeout Typed quantities: a lump sum, the lift days, a fire alarm subcontract quote and the closeout hours. | Typed | EA, DAY |
Count devices and fixtures.
Press Space, pick the device and click each one on the power plan. Or box one symbol and auto count counts its matches on that sheet as the item you hold. Check the count against the plan before you price it.
Make one fixture item for each type mark on the fixture schedule, and count each type on the lighting plans.

Measure conduit, cable and wire.
Draw EMT and MC runs along the plan, or type a length. The EMT items buy the conduit in whole sticks, with a coupling at each stick, a connector at each end and straps at the spacing you set. The MC items add the makeup and buy whole coils.
Take the wire with the wire in conduit item: the run's length and makeup times the conductors. Where a device's wire comes with the conduit, set its wire allowance to zero.
Every device is an assembly.
A duplex receptacle in the pack is the box, its mud ring, the device, its plate, connectors and a wire allowance, with a rough-in and a trim labor part. A fixture is the fixture, its whip, its box and its supports.
Change the wire allowance, the conductors or the strap spacing on the job's copy of the item, or on one takeoff where it differs. Saving it back to your library is a separate step you choose.

Labor in Rough-in and Trim.
Every labor part in the pack is in one of two labor categories, Rough-in and Trim. Give each part your own production rate, total hours or a crew and its days. No rate ships: a labor part shows as Missing until you set yours, never as zero.
Price wire and MC cable by tag: set a value per foot for each size once, and every part with that tag is priced from it.

Start the proposal from the pack's clauses.
The pack's inclusions, exclusions and clarifications go on the job's Scope, ready to edit: branch wiring and devices, fixtures from the schedule, panels and feeders on the one-line; fire alarm, low-voltage cabling, temperature controls and utility charges excluded unless listed.
Change the wording for your company once, and each job can add its own lines. The proposal prints them with the amounts from Pricing, as a PDF or a Word file.
What the electrical starter pack includes.
The electrical starter pack is included basics: a folder tree of items and assemblies with their parts and formulas, two labor categories, tags and proposal clauses, plus the scope assistant's setup for electrical. Import it from the library and it becomes your company's to edit. No prices and no production rates ship.
- Devices: duplex, GFCI and dedicated 20A receptacles, single-pole and 3-way switches and a wall switch occupancy sensor, each with box, mud ring, plate, connectors and a wire allowance
- A floor box with its device and cover, and a data outlet rough-in with box, ring, conduit stub and pull string
- EMT from 1/2" to 2" with couplings, connectors and straps; MC cable 12/2, 12/3, 10/2 and 10/3 with connectors and supports; wire in conduit in #12, #10 and #8 THHN
- Fixtures: 2' × 4' and 2' × 2' LED troffers, recessed downlight, LED strip, exit sign, emergency light and exterior wall pack
- Panels and gear: a 225A panelboard with breakers, a 75 kVA dry-type transformer, a 60A fused disconnect and an equipment connection
- Job items: temporary power and lighting, lift rental, a fire alarm subcontract, and testing, labeling and closeout
- Rough-in and Trim labor categories, and tags for each wire and MC cable size
- Inclusions, exclusions and clarifications for electrical work
- The scope assistant's electrical setup: what to look for, the disciplines and spec sections to read, what is usually by others and the checks that matter
The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

Find the electrical scope. Settle what is by others.
The pack's assistant setup reads the one-line diagram and the schedules first, then the power and lighting plans and the equipment schedules on the mechanical and plumbing sheets. It highlights where your scope is with a jump to each spot, flags possible conflicts, such as a panel on the one-line with no panel schedule or equipment with no circuit, and flags work that is usually another trade's:
- The fire alarm system
- Data, security and audiovisual cabling and devices
- Temperature controls
- Utility service and metering
- Furnishing mechanical equipment and starters
AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.
Moving from another takeoff tool?
Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.
Electrical questions
What comes in the electrical starter pack?
Can I build my own electrical assemblies?
Can it count symbols on scanned drawings?
Does Kredna read the panel schedules into items?
Can I price low voltage separately?
Bring a set of power and lighting plans you know.
See the counts, runs, labor and proposal come together on work your company actually bids.