Fire sprinkler estimating software

Bid more sprinkler jobs. Count heads by type.

Heads by type from the fire protection plans or the reflected ceiling plans. Mains and branch lines by size and length, with hangers at your spacing.

Kredna counts and measures on the PDF and prices the takeoff with your own items and costs.

22'-0"
Branch line, 1"1,860 LF
Light hazard area, level 218,400 SF
Pendent heads214 EA

Illustration on a made-up plan.

What a sprinkler takeoff carries.

Heads are counted by type. Pipe is drawn as runs, one item for each size, and the hangers come from the length through a part on the pipe item.

What you take offHowCarried in
Pendent heads
Click each head, or box one head and auto count counts its matches on the sheet. Check the count against the legend.
CountEA
Upright, sidewall and concealed heads
One item for each type.
CountEA
Branch line pipe
Pipe size on the item.
LinearLF
Main pipeLinearLF
Hangers
A part on the pipe item: one at each spacing along each run, at the spacing you set.
LinearEA
Risers with control valve
From the riser diagram.
CountEA
Flow and tamper switchesCountEA
Fire department connection and backflow preventerCountEA
Standpipe hose valvesCountEA

Count heads by type.

Keep each head type as its own item: pendent, upright, sidewall and concealed. Click each head on the plan, or box one symbol and auto count counts its matches on that sheet as the item you hold.

Check the count against the legend before you price it. Crowded plans and scanned sheets need a closer look.

Takeoff: a plan measured by item, with the job tree and its quantities beside it

Run the pipe by size. Hang it at your spacing.

Draw mains and branch lines on the fire protection plans, each item at its size. Give the pipe item its parts once: the pipe from the length drawn, the hangers from the length and your spacing, and the labor in your own categories.

Fittings can be a waste allowance on the pipe or parts of their own, as your company prices them.

The item editor over the drawing: an item's properties and its parts, each quantity a formula

Take risers and trim from the riser diagram.

Count risers, flow and tamper switches, the fire department connection, the backflow preventer and the hose valves from the riser diagrams and the plans. Keep each riser's equipment in its own folder by level or area.

Price to the hazard on the drawings.

Write the clarification once in your company clause list: the system is priced to the hazard classifications on the drawings, and a change of occupancy is extra. Where design and permit drawings are delegated to you, an inclusion says so. Each job starts from your list and can add its own lines.

Build your sprinkler items once.

There is no fire sprinkler starter pack. Make the items you price in your library once, each with its parts and quantity formulas, and every job copies them when it first uses them. For example:

  • Pendent, upright, sidewall and concealed heads, each with its labor
  • Branch line and main pipe by size, with hangers at your spacing
  • Riser with control valve, flow switch and tamper switch
  • Fire department connection, backflow preventer and hose valve
  • Your clauses for the system and delegated design, the hazard classifications, and the underground service, alarm wiring and painting by others

The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

The library: folders of items and assemblies, each with its parts

Find the sprinkler scope. Settle what is by others.

Set up the scope assistant for fire sprinklers once: what to look for, the disciplines and spec sections to read, and what is usually by others. It reads the fire protection plans, riser diagrams, reflected ceiling plans and notes, highlights where your scope is with a jump to each spot, and flags work that is usually another trade's, such as:

  • The underground fire service to the building, unless listed
  • Fire alarm wiring and monitoring
  • Power to the fire pump
  • Painting of exposed pipe
  • Ceiling work

AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.

Moving from another takeoff tool?

Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.

Fire sprinklers questions

Can Kredna count sprinkler heads from the plans?
Yes. Click each head with the count tool, or box one head symbol and auto count counts its matches on that sheet as the item you hold. Check the count against the legend before you price it.
How is sprinkler pipe taken off?
Draw each main and branch line as a linear run, with one item for each size. The pipe item's parts work out the pipe with your waste and the hangers at the spacing you set.
Which drawings does a sprinkler takeoff use?
The fire protection plans and riser diagrams, the reflected ceiling plans for head locations, the fire protection notes and hazard classifications, the site utility plans for the fire service, and the life-safety plans.
What if the system is ours to lay out?
Count heads from the reflected ceiling plans, and keep an inclusion in your clause list for design, calculations and permit drawings where the system is delegated to you.
What does the AI do on a sprinkler job?
The scope assistant reads the documents you set it up for and points to where the sprinkler work is, by sheet, so you can jump to each spot. It flags work that is usually another trade's and possible conflicts, and can draft an RFI or an exclusion. It never counts heads or measures pipe, and everything it drafts waits for you to accept it.

Bring a sprinkler set you know.

See heads, pipe and the proposal come together on a job your company has bid.