Flooring estimating software
Bid more flooring. Price each room's finish.
The finish plan shows the rooms, the room finish schedule gives the floor and base, and the legend says what each code is.
Draw each room in Kredna and carpet carries in square yards, hard surfaces in square feet and base in linear feet.
Illustration on a made-up plan.
What a flooring takeoff covers.
Rooms go in as areas with cutouts for columns and casework. Base goes in by length, and transitions and stair treads by count.
| What you take off | How | Carried in |
|---|---|---|
| Broadloom carpet Drawn room by room; bought by the square yard with waste. | Area | SY |
| Carpet tile | Area | SY |
| Luxury vinyl tile and vinyl composition tile | Area | SF |
| Sheet vinyl | Area | SY |
| Rubber and wood flooring | Area | SF |
| Resinous floors | Area | SF |
| Rubber base Around the rooms, door openings left out. | Linear | LF |
| Transition strips At each change of flooring at a door or opening. | Count | EA |
| Stair treads and risers Counted per step. | Count | EA |
| Floor leveling and moisture mitigation | Area | SF |
Carpet carried in square yards.
Measure in one unit and buy in another: draw the room in square feet and a part carries carpet, carpet tile or sheet vinyl in SY, with waste applied once before the conversion. Hard and resilient flooring stays in SF, and base in LF. A metric company carries the same in m².
Patterns, borders and the direction of installation need more waste, so a selected takeoff can carry its own.

Room by room from the finish plan.
Set the finish plan's scale and draw each room, with cutouts for columns and casework, or click inside a room with click fill. Put the rooms in folders by floor or area, and mark a folder as an alternate to keep an alternate apart.
When an addendum replaces the finish plan, the old sheet stays, marked as replaced, and the takeoffs on it are flagged for you to check.
Price the floor prep you carry.
Give floor leveling and moisture mitigation their own items, by area, and say in your clauses how much patching the price covers, so the proposal says what you carried.
Price the goods. Add your installers.
Price the carpet and resilient goods from each part's cost or from a tag your company prices per unit. Add install labor as a production rate, total hours or a crew duration, and set markup in the recap.
Items a flooring company builds once.
Build your flooring items in the library once, with their parts and waste, and each job copies the ones it uses. Examples of what flooring companies build:
- Broadloom carpet and carpet tile, measured in SF and bought by the SY
- Luxury vinyl tile and vinyl composition tile
- Sheet vinyl, by the SY
- Rubber, wood and resinous flooring
- Rubber base, transition strips, and stair treads and risers
- Floor leveling and moisture mitigation
- Your flooring inclusions, exclusions and clarifications
The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

Flooring scope that is usually someone else's.
Write the assistant's setup for flooring once: what to look for, the sheets and spec sections to read, and what is usually by others. It then reads the finish plans and the room finish schedule you choose, including floor prep and patterns, highlights each place for you to jump to, and flags lines like these as usually another trade's. Findings stay drafts until you accept them.
- Ceramic and stone tile unless listed
- Polished and sealed concrete unless listed
- The concrete slab and its repair
- Entrance mats and grilles unless listed
AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.
Moving from another takeoff tool?
Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.
Flooring questions
Can Kredna take off carpet in square yards?
How is flooring waste handled?
Can I see the cost per square foot?
What happens when the finish plan is revised?
Can the AI read the room finish schedule?
Bring a finish plan you know.
See how the rooms, the base and the proposal fit together on a job your company bids.