How to do an electrical takeoff

An electrical takeoff counts the devices, fixtures and equipment on the drawings by type, measures the conduit and wire that feed them, and picks up the panels, feeders and connections shown on the one-line diagram and the schedules.

Do the counts first. They are the easiest part to check. Lengths take longer and need more judgment.

1. Read the legend and the symbol schedule.

Electrical symbols change from one engineer to the next. Before counting, read the symbol legend, the abbreviations and the general notes on the first electrical sheets.

Write down each symbol you will count and what it means on this job: duplex receptacle, GFCI receptacle, dedicated receptacle, single-pole switch, three-way switch, dimmer, occupancy sensor, junction box. Note the mounting heights the legend or notes give.

Then read the light fixture schedule. Each fixture type, such as A, B or C, has its own description, mounting and sometimes its own controls.

2. Count devices and fixtures by type.

Count one type at a time across a sheet, and mark each symbol as you count it so it is not counted twice. Keep the counts separate by floor or area where the bid needs it.

Check the lighting plans against the architect's reflected ceiling plans. The ceiling layout may show fixtures, exit signs or ceiling devices that differ from the electrical plan. Raise any difference as a question.

Reconcile the fixture count with the fixture schedule. A type in the schedule with no fixtures on the plans, or a tag on the plans with no schedule line, needs an answer before pricing.

Count the equipment connections too. Read the mechanical, plumbing and kitchen equipment schedules for every unit that needs power: rooftop units, exhaust fans, pumps, water heaters, kitchen equipment. Each one may need a disconnect, a flexible connection and a circuit back to its panel.

3. Take off panels and feeders from the one-line.

The one-line or riser diagram shows the service, switchboards, panelboards and transformers, and the feeders between them. The panel schedules give each panel's breakers, circuits and loads.

  • Count each switchboard, panel, transformer and disconnect by size and type.
  • Read the feeder tags or the feeder schedule for the conductors and conduit in each feeder.
  • Measure each feeder route on the plans between the equipment locations, and add the vertical rise between floors.

Feeder wire = (conduit length + makeup at both ends) × conductors per set × parallel sets.

One feeder
  • Feeder: 4 #4/0 and 1 #4 ground in 2-1/2" conduit, one set
  • Conduit: 120 LF horizontal + 14 LF rise = 134 LF
  • Wire per conductor, 5 ft makeup at each end: 134 + 5 + 5 = 144 LF
  • #4/0: 144 × 4 = 576 LF. #4 ground: 144 LF

Use the makeup length your company uses for terminations. Long runs may also need pull boxes.

4. Measure branch conduit and wire with drops and rises.

Branch circuits are often drawn only as homerun arrows with circuit numbers, so you lay out the routing between devices. Measure a sensible route from device to device and back to the panel.

Add the vertical lengths the plan cannot show. A wall device fed from above carries a drop from the ceiling space:

Drops
  • Conduit run above a 10'-0" ceiling
  • Receptacle at 18" to center: 10.0 - 1.5 = 8.5 ft per drop
  • Switch at 48" to center: 10.0 - 4.0 = 6.0 ft per drop

Add rises to the floor above, drops to floor boxes and runs up to rooftop equipment the same way.

Branch wire = conduit length × conductors in the run, plus makeup at each box:

Branch run
  • 300 LF of 3/4" EMT with 2 #12 and 1 #12 ground
  • Wire: 300 × 3 = 900 LF of #12, plus makeup at each box

Check the specification for where cable assemblies are allowed in place of conduit and wire. It changes the material and the labor.

5. Add boxes, fittings and supports.

Every device and most fixtures need a box. Build each device as an assembly: the box, the mud or plaster ring, the device, the cover plate and its share of the circuit.

Conduit fittings follow from the length and the number of runs:

  • Couplings: about one per 10-foot stick of EMT.
  • Connectors: one at each end of each run.
  • Straps and supports at the spacing the code and the specification require.
  • Elbows and pull boxes where the route turns or runs long.
Couplings
  • 300 LF ÷ 10 ft per stick = 30 sticks
  • About 30 couplings, plus 2 connectors per run

Rated-wall penetrations, roof penetrations and core drilling are easy to leave out. Note them with the run that needs them.

6. Pick up the systems the floor plans leave out.

Some electrical work sits on riser diagrams, details and site plans rather than on the power and lighting plans. Sweep the set for it before pricing:

  • Grounding and bonding: the grounding electrode system, ground rods, bonding of water and gas piping and of structural steel.
  • Lighting controls: control panels, relays, low-voltage switches, daylight sensors and their wiring.
  • Emergency power: generators, transfer switches, emergency panels and the separate feeders they need.
  • Site lighting: poles, bases, fixtures, handholes and the underground conduit to them.
  • Temporary power and lighting, where the specification puts it in your scope.

Read the details for each item. A pole base, a generator pad or a ground ring may carry work that belongs to another trade, which goes on your by-others list.

7. Keep rough-in and trim apart for pricing.

Electrical labor follows the units in the takeoff: per device, per fixture, per LF of conduit and wire, per panel. Many contractors price rough-in and trim separately because they happen at different stages of the job.

Use your own production rates, or your crew size and duration. Adjust for height, ceiling type and work in occupied space.

8. Sort out what is by others.

Electrical drawings show work that other contractors often carry. Read the specification and the bid form for the split, and state it in your proposal. Work that commonly needs a clear line:

  • Low voltage: data, telecom, security, access control and audiovisual. Often a separate contractor, sometimes with conduit and boxes by electrical.
  • Fire alarm: devices and wiring may be by a fire alarm contractor with boxes and conduit by electrical, or the whole system may be in your scope.
  • Controls: temperature control wiring is often by the mechanical or controls contractor.
  • Equipment: motors, starters and drives may be furnished by others and connected by you.
  • Utility work: the primary service, the utility transformer and metering may belong to the utility.
  • Related work: trenching, concrete pads, cutting and patching, painting and roof flashing.

The split changes from job to job. Read it every time rather than carrying the last job's assumptions.

Electrical takeoff checklist.

  • Legend and notes read, with a symbol list for this job.
  • Fixture schedule reconciled with plan counts.
  • Lighting plans compared with the reflected ceiling plans.
  • Devices counted by type and area.
  • Equipment connections taken from every equipment schedule.
  • Panels, transformers and disconnects counted from the one-line.
  • Feeders measured with rises and makeup.
  • Branch conduit and wire measured with drops.
  • Boxes, fittings and supports carried.
  • By-others split written into the proposal.

The same electrical takeoff in Kredna.

In Kredna you count devices and fixtures by type on the PDF, and auto count finds the repeats of a symbol you box on the sheet, for you to review. Conduit is a linear takeoff. The electrical starter pack is included: its devices are items whose parts carry the box, mud ring, device, plate and a wire allowance, each with its own formula. The pack sets no prices: your company enters its own.

See the electrical estimating page and takeoff.

Related

Worked examples show the arithmetic only. Conductor sizes, makeup lengths and support spacing must come from the drawings, the specification and the code that applies to the job.