Site utility estimating software
Bid more utility work. Price the trench too.
Draw each run structure to structure on the utility plan. The pipe, the trench excavation and the bedding stone come off the same line, with the depth read from the profiles.
Illustration on a made-up plan.
What you take off for site utilities.
Draw pipe on the plan view and read the depths from the profile. Count structures, hydrants and valves on the same sheet, so each quantity stays tied to the run it belongs to.
| What you take off | How | Carried in |
|---|---|---|
| Storm pipe Drawn structure to structure. Parts work out the trench excavation from length, width and depth, and the bedding stone from the bedding depth. | Linear | LF, CY |
| Sanitary sewer pipe The same trench and bedding parts, with the depth set from the profile. | Linear | LF, CY |
| Water line | Linear | LF, CY |
| Pavement cut and patch over trench With the width cut and patched as a property of the item. | Linear | LF, SF |
| Manholes Each with its depth from rim to invert. | Count | EA |
| Catch basins and inlets | Count | EA |
| Cleanouts | Count | EA |
| Fire hydrant assemblies | Count | EA |
| Valves and boxes | Count | EA |
| Taps into existing mains | Count | EA |
Trench depths from the profiles.
Give the pipe item a trench width, an average depth and a bedding depth from the profiles. Where a run goes deeper, set its depth on that takeoff alone: it overrides the item's, and the deeper trench prices apart from the rest.
Where the plan and the profile share a sheet at different scales, draw a scale region around each.
Structures counted with their depths.
Count manholes, catch basins and cleanouts on the plan. Give each manhole its depth from rim to invert, so the deep ones can be priced as their own items.
Say where your pipe stops.
The point of connection is where utility scope overlaps. Keep clauses in your company list that end your work at the points of connection on the plumbing drawings, and exclude utility company fees, paving restoration beyond the trench patch, and rock and dewatering unless listed.
Build your site utility items once.
There is no site utilities starter pack. Build your items in your library, in folders for pipe, structures and water service. Give each pipe item its trench and bedding as parts, so the earth and stone follow the length you draw. Items like these:
- Storm pipe, by size, with trench excavation and bedding stone
- Sanitary sewer pipe, by size, with trench excavation and bedding stone
- Water line, by size, with trench excavation and bedding stone
- Pavement cut and patch over trench, with its width
- Manhole, with its rim to invert depth
- Catch basin or inlet
- Cleanout
- Fire hydrant assembly
- Valve and box
- Tap into existing main
- Your own clauses for pipe and structures, testing, utility fees, paving restoration, rock and dewatering, and points of connection
The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

Utility scope that is usually someone else's.
Set up the scope assistant for site utilities once: what to look for, which sheets and spec sections to read, and what is usually by others. It reads the utility plans, profiles and structure schedule for pipe, structures, valves and trenching, highlights each reference so you can jump to it, and flags lines like these as usually another trade's. Its findings stay drafts until you accept them.
- Piping inside the building, up to the point of connection the plumbing drawings name
- Electrical wire and equipment in site conduit
- Paving restoration, unless listed
- Utility company fees and the connections the utility makes itself
AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.
Moving from another takeoff tool?
Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.
Site utilities questions
Can Kredna take off trench excavation with the pipe?
Can I take off from plan and profile sheets?
Does it work out trench depth from the inverts?
Are pipe and structure prices included?
What does the scope assistant look for on utility sheets?
Bring a utility set you know.
See pipe, trench and structures taken off from the plan and profile and priced with your own crews.