Specialties estimating software
Bid more specialties work. Count from the plans.
Partitions are on the enlarged toilet room plans, accessories are on the schedule and the elevations, and signs are on the signage plans.
Count them in Kredna on the sheets they are drawn on and the price builds from your own costs.
Illustration on a made-up plan.
What a specialties takeoff covers.
Most of this trade is counted, item by item, from the schedules and the enlarged plans. A few things, such as wall protection, go in by length.
| What you take off | How | Carried in |
|---|---|---|
| Toilet partitions, standard and accessible Counted per compartment. | Count | EA |
| Urinal screens | Count | EA |
| Grab bar sets | Count | EA |
| Tissue, soap and paper towel dispensers From the accessory schedule and the toilet room elevations. | Count | EA |
| Mirrors | Count | EA |
| Fire extinguishers and cabinets Located on the life-safety plans. | Count | EA |
| Corner guards With the guard's height as a property. | Count | EA |
| Lockers and markerboards | Count | EA |
| Room signs From the signage schedule. | Count | EA |
| Wall protection and handrails | Linear | LF |
Count on the plans. Check against the schedule.
Count each accessory on the enlarged toilet room plans and elevations with the item for its type, and the totals in the job tree sit beside the accessory schedule's own count.
Auto count takes one boxed symbol or tag and counts its matches on the sheet as the item you hold.
Toilet rooms in folders the way you build them.
Put each floor or area in its own folder so each set of toilet rooms shows its partitions, screens and accessories with their price. Copy the takeoffs of a typical floor and paste them on the next sheet.
Furnish, install or both.
Price the material from each part's own cost or a tag, and put your installers on as labor parts: a production rate, total hours or a crew duration. A part the owner furnishes is set to zero by choice, so it never reads as a missing price, and your clauses say what you furnish and what you install.
Say what the count covers.
Keep your specialties inclusions, exclusions and clarifications in the company clause list: the items on the schedules furnished and installed with their anchors, blocking, owner-furnished items and power left out, and counts following the schedules. Questions for the GC go in the RFI log.
Scope and proposalsThe RFI logProposal scope for subcontractors
Items a specialties company builds once.
Build your partitions, accessories and specialties in the library once, with their parts, and each job copies the ones it uses. Examples of what specialties companies build:
- Toilet partitions, standard and accessible compartments
- Urinal screen and grab bar set
- Tissue, soap and paper towel dispensers, and mirrors
- Fire extinguisher and cabinet
- Corner guard, with its height
- Locker and markerboard
- Room sign
- Your specialties inclusions, exclusions and clarifications
The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

Specialties scope that is usually someone else's.
Write the assistant's setup for specialties once: what to look for, the sheets and spec sections to read, and what is usually by others. It then reads the enlarged plans, the accessory and signage schedules and the life-safety plans you choose, highlights each place for you to jump to, and flags lines like these as usually another trade's. Findings stay drafts until you accept them.
- In-wall blocking and backing
- Plumbing fixtures
- Power for powered accessories and signs
- Owner-furnished items the notes list
AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.
Moving from another takeoff tool?
Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.
Specialties and accessories questions
Can I count toilet accessories from the schedule?
Do lockers, signs and extinguisher cabinets go in the same estimate?
How do I handle owner-furnished items?
Can I enter a count without drawing it?
Does the AI find the accessories?
Bring a toilet room set you know.
See how the counts, the schedules and the proposal fit together on a job your company bids.