Masonry estimating software

Bid more masonry jobs. Count block from the wall.

Draw each block wall along its centerline and set its height. Build the wall item once, and the block, joint reinforcing and mortar come from the face of the wall. Veneer comes off the elevations.

22'-0"
8" CMU wall, 12' high742 LF
Brick veneer6,180 SF
Loose lintels to set28 EA

Illustration on a made-up plan.

What you take off for masonry.

Take off block walls on the plans with their heights from the wall types and sections, and veneer on the elevations with the openings cut out. Courses, joints and flashing are runs of their own.

What you take offHowCarried in
8" and 12" CMU walls
Drawn on the centerline with a height property. Block from the face at 1.125 a square foot, joint reinforcing at its spacing up the wall.
LinearSF, EA, LF
Bond beamsLinearLF
Lintel coursesLinearLF
Control jointsLinearLF
Brick veneer
Drawn on the elevations with openings cut out. Brick at about 6.75 a square foot, ties at the spacing the details give.
AreaSF, EA
Stone veneerAreaSF
Cast stone sillsLinearLF
Through-wall flashingLinearLF
Cleaning and sealingAreaSF
Loose lintels set
From the lintel schedule, where the notes have the mason set them.
CountEA

Block from the face of the wall.

Each 8" × 16" block lays 0.89 square feet of face, so a block part's formula follows the length you draw and the height you set. Joint reinforcing follows its spacing up the wall.

Set the face a bag of mortar lays in your practice, and the bags follow every wall drawn with that item.

The item editor over the drawing: the item's properties and its parts, each quantity a formula

Veneer off the elevations.

Draw veneer areas on the building elevations with the openings cut out. Brick, ties and mortar come from the area. Stone, sills and flashing are items of their own.

Grout and bars from the structural notes.

Reinforced block is called out in the structural notes and details. Add grout and bars as parts of your block wall items, and override the spacing on a takeoff where one wall differs from the rest.

Lintels and weather in writing.

Loose lintels and shelf angles are usually furnished by the metals trade and set by the mason. Keep exclusions for furnishing them, cavity insulation, air barrier and joint sealant in your company clause list, with a clarification for cold-weather protection, and add them to each job's scope.

Build your masonry items once.

There is no masonry starter pack. Build the walls and veneers your company prices once, with the parts that follow the face area you draw, and every job copies them when it first uses them. For example:

  • 8" concrete block wall, with block, joint reinforcing and mortar
  • 12" concrete block wall, with block, joint reinforcing and mortar
  • Bond beam
  • Lintel course
  • Control joint
  • Brick veneer, with modular brick, veneer ties and mortar
  • Stone veneer
  • Cast stone sill
  • Through-wall flashing
  • Cleaning and sealing

The prices are yours to set. A part without a price shows as Missing, never as zero, and every total that includes it is marked incomplete until you price it.

The library: folders of items and assemblies, each with its parts

Masonry scope that is usually someone else's.

Set up the scope assistant for masonry once. It finds your scope in the plans, wall types, elevations, wall sections and lintel schedule, highlights each reference so you can jump to it, and flags lines like these as usually another trade's. Every finding stays a draft until you accept it.

  • Loose lintels and shelf angles, furnished by the metals trade and set by the mason when the notes say so
  • Cavity insulation and air barrier, unless listed
  • Sealant at joints
  • Concrete footings

AI findings need estimator review. Check quantities, costs and scope against the project documents before submitting a bid.

Moving from another takeoff tool?

Pick an item, measure on the sheet and watch the quantity total in the job tree. Build your items once in the library, and the takeoff, pricing and proposal all read the same job.

Masonry questions

How does Kredna count block?
With a part on your wall item: the length you draw times the height you set, at 1.125 block a square foot for an 8" × 16" unit. Waste is set on the item and applied once.
Can I take off brick veneer by the square foot?
Yes. Draw the veneer on the elevations with the openings cut out. Your veneer item carries brick at about 6.75 a square foot and ties at the spacing the details give.
Does it work out mortar?
Once you set the coverage. Coverage depends on your practice, so set the face a bag lays and the bags follow the wall.
Does it come with masonry prices?
No. Price your own items with your suppliers' prices and your crews. A part without a price shows as Missing, never as zero.
What does the assistant look for on a masonry set?
What your company tells it to: block walls, veneer with its ties and flashing, grout and reinforcing in block, joints, sills and copings, cleaning and scaffolding. It highlights each reference on the sheet and flags what is usually another trade's. It never measures or prices.

Bring a masonry set you know.

See block walls and veneer taken off, counted and priced with your own crews.