Unit prices
Add unit prices on the Scope step, linked to an item (cost per unit plus markup) or typed. The recap lists each with its basis.
A unit price is a rate the GC can use for added or removed work, such as "Additional stud wall, per LF".
Add a unit price
- Open the Scope step and find Unit prices.
- Click + Add unit price.
- Type the Description as the customer will read it, and the Unit.
- Pick the Linked item, or None (typed rate only) and type a rate.
How the rate is worked out
- Linked to an item: the item's cost per unit plus markup (its folder's markup, if the folder has its own). No tax, bond or insurance.
- Typed: the rate you type. Leave the typed rate empty to use the calculated one.
The proposal states the basis: "Unit prices include overhead and profit. They exclude sales tax, bond and insurance."
A linked item with a part not priced makes the rate incomplete; it reads "+".
Print it or not
Each unit price has a Printed switch for the proposal.
In the recap
Pricing's recap lists every unit price with its rate and its basis ("linked (item)" or "rate typed"). Unit prices never change the base bid.
Something here doesn't match what you see in the app? Tell us at support@kredna.com.