The recap

The recap on the right of Pricing runs Cost → Markup → Tax → Subtotal → Bond → Insurance → Calculated bid → Final bid → Base bid, and each line shows its base.

The recap is the one calculation every screen, the proposal and every sent revision use. Each line says what it is worked out from.

The lines

  1. Cost: material + labor + equipment + subcontract, for every base folder.
  2. Markup: a percent on cost, with folder overrides. See Markup and margin.
  3. Tax: a percent of the tax base (taxable material, unless you change it). Tax comes after markup and is never marked up.
  4. Subtotal: cost + markup + tax.
  5. Bond: a percent of the subtotal.
  6. Insurance: a percent of the subtotal. Bond and insurance don't compound.
  7. Calculated bid: subtotal + bond + insurance.
  8. Final bid: optional. Type a number to round. See The final bid.
  9. Adjustment: final − calculated, shown only when you type a final bid.
  10. Base bid: the final bid if typed, otherwise the calculated bid.

The header says Base scenario and how many folders it holds. Alternates are left out of these lines.

Change a percent

Click the percent beside Markup, Tax, Bond or Insurance, type it and press Enter. Each line's base text (such as "on taxable material") opens more choices where there are any.

New jobs start from the company's Recap defaults in Settings › Company. Changing the defaults doesn't change open jobs.

Below the lines

  • Labor by category: crew-hours, person-hours and cost per labor category, each with an include box. See Labor by category.
  • Alternates: each one's add or deduct amount. See Alternates.
  • Unit prices: each one's rate and basis. See Unit prices.

When something isn't priced

Totals that include a missing price read "+", and Base bid says "incomplete · (number) not priced". See Missing is never zero.

Something here doesn't match what you see in the app? Tell us at support@kredna.com.