Replaced sheets and flagged takeoffs
A sheet an addendum replaced stays in the job, struck through under its new revision, and the takeoffs on it are flagged to move.
How a replaced sheet looks
- In the sheet list, it stays under the sheet that replaced it, struck through and marked "↳", with "replaced by rev 2". If takeoffs are still on it, it adds "3 takeoffs to move" in red.
- In the Sheets panel, its page shows replaced.
- In Takeoff, its takeoffs draw dashed, and the job tree marks each one CHECK.
When you first open Takeoff, it starts on the first sheet that isn't hidden or replaced.
Deal with the flagged takeoffs
The flagged takeoffs stay in the estimate until you change them.
- On the addendum banner, click Go to the takeoffs, or open the old sheet in Takeoff.
- Compare the old sheet with the new revision.
- Redraw what changed on the new sheet. To reuse takeoffs, select them, copy them (Ctrl+C), open the new sheet and paste (Ctrl+V), then place them with Move.
- Delete the old takeoffs once the new ones are drawn.
See Edit and change takeoffs for copying, moving and deleting.
Something here doesn't match what you see in the app? Tell us at support@kredna.com.